Natomas Short-Term Sidewalk & Street Closures

BY THE NATOMAS BUZZ STAFF
THE NATOMAS BUZZ | @natomasbuzz

The following are anticipated short-term street and/or sidewalk closures in Natomas, according to the Sacramento Public Works Department:

  • Bridgeford Drive at Carberry Way (periodic sidewalk and traffic lane closures for concrete curb ramp construction)
  • Bridgecreek Drive, between Crossmill Way and Truxel Road (periodic sidewalk and traffic lane closures for roadway pavement repair)
  • Club Center Drive, between Mabry and Northborough Drives (periodic sidewalk and traffic lane closures for streetscapes maintenance)
  • Creekside area (periodic sidewalk and traffic lane closures for roadway pavement work)
  • Dorine Way at Brunswick Way (periodic sidewalk and traffic lane closures for concrete curb ramp construction)
  • Dorine Way at Erin Drive (periodic sidewalk and traffic lane closures for concrete curb ramp construction)
  • Dorine Way at Omalley Way (periodic sidewalk and traffic lane closures for concrete curb ramp construction)
  • Dorine Way at W El Camino Avenue (periodic sidewalk and traffic lane closures for concrete curb ramp construction)
  • Dynasty Way, between Antell Avenue and Danbrook Drive (periodic sidewalk and traffic lane closures for trench cuts)
    Erin Drive at Dorine Way (periodic sidewalk and traffic lane closures for concrete sidewalk and curb and gutter repair)
  • Frogs Leap Court, North of Boathouse Way (periodic sidewalk and traffic lane closures for trench cuts)
  • Longview Drive, between SR 80 Exit and Watt Avenue (periodic sidewalk and traffic lane closures for roadway pavement repair)
  • Miramonte Drive, between San Juan Road and Bandon Way (periodic sidewalk and traffic lane closures for trench cuts)
  • Natomas Boulevard, between Club Center Drive and Del Paso Boulevard (periodic sidewalk and traffic lane closures for streetscapes maintenance)
  • Norcross at Arundel Way (periodic sidewalk and traffic lane closures for concrete sidewalk and curb and gutter repair)
  • Regency Park area (periodic sidewalk and traffic lane closures for roadway pavement work)
  • Rio Rosa Way, North of Rio Cresta Way (periodic sidewalk and traffic lane closures for trench cuts)
  • Rivermont Court, East of Morell Street (periodic sidewalk and traffic lane closures for concrete sidewalk and curb and gutter repair)
  • Sagemill Way, between Oak Rim and Crossmill Ways (periodic sidewalk and traffic lane closures for roadway pavement repair)
  • Truxel Road, between San Juan Road and W El Camino Avenue (periodic sidewalk and traffic lane closures for utility work)
  • Unity Circle, North of Unity Pointe Avenue (periodic sidewalk and traffic lane closures for roadway pavement repair)
  • Urbana Way, between Montree Drive and Volti Way (periodic sidewalk and traffic lane closures for roadway pavement repair)
  • Village Seven area (periodic sidewalk and traffic lane closures for roadway pavement work)
  • W El Camino Avenue at Norbert Way (periodic sidewalk and traffic lane closures for concrete curb ramp construction)
  • W El Camino Avenue, between Garden Oaks Drive and Truxel Road (periodic sidewalk and traffic lane closures for roadway pavement repairs)
  • Westward Way, between Bridgeford and Edmonton Drives (periodic sidewalk and traffic lane closures for roadway pavement repair)
  • Woodbridge Oak Way, between Truxel Road and Buckridge Way (periodic sidewalk and traffic lane closures for tree maintenance)

Speak Your Mind